Burners01Vessel equipment02Controls03Parts04Learn More05Gallery06About Us07Our story09Customer portal10Parts store11Log in to the portalAPP
Create an accountRequest a quote(918) 832-1100
00 ORDER REPLACEMENTS · SERIAL & PO LOOKUP

Every unit since 1980
is on file.

Drawings, sizing decisions, materials, filed by serial number and purchase order for 45 years. Send us either one and we build the exact replacement from the original drawing. No re-engineering, no guesswork, no "close enough."

FILED SINCE 1980 EXACT-FIT REPLACEMENT QUOTE IN 24 HRS
FIG. 00 · UNIT RECORD, ILLUSTRATIVE
01 START A REPLACEMENT ORDER

Send the serial.
We do the rest.

A little information is all we need to guide you the rest of the way and get you the burner you need.

Already have a Flameco account? Log in to the customer portal to manage your details with the shop.

Log in Create an account
FIG. 01 · REPLACEMENT REQUEST

Can't find the serial tag?

No problem. A purchase order number, an old invoice, or even the company name and rough install year is usually enough for us to pull the record. Worst case, send a photo of the unit and we'll identify it.

Prefer to talk it through? Call the shop. You'll reach someone who has stood next to these units, not a call center.

(918) 832-1100
online@flameco.com
MON–FRI · TULSA, OK
Contact Information
Order Information
EITHER ONE WORKS
We'll pull the drawing and come back within one business day.
02 HOW IT WORKS

Serial in.
Quote out. 24 hours.

Because the record already exists, replacement is the fastest path through our shop. Nothing to size, nothing to redesign.

STEP 1 / 3

Send the serial or PO

Use the form above, email, or call. One number is enough: serial tag, purchase order, or an old invoice all point to the same file.

INPUT · ONE NUMBER
STEP 2 / 3

We pull the drawing

Every unit built since 1980 is drawn and filed. We retrieve the original drawing with its sizing decisions and materials, the burner as it was actually built.

ARCHIVE · 45 YEARS DEEP
STEP 3 / 3

Quote in 24 hours

You get a firm quote for the exact replacement within one business day. Approve it and the order goes straight to the floor.

OUTPUT · EXACT FIT
FIG. 02 · REPLACEMENT PATH, SERIAL → DRAWING → QUOTE NO RE-ENGINEERING REQUIRED
03 ONCE IT'S ORDERED

The same discipline
that built the original.

A replacement runs the same four-stage process as a new unit, just with the hardest step already done.

STAGE A

Assessment

A little information is all it takes: we guide you the rest of the way and confirm the record matches what's in the field today.

STAGE B

Size & quote

Years of experience behind every option: we match the replacement to your project and your budget before anything is cut.

STAGE C

Manufacturing

A strict lean manufacturing system, enforced by a strong team of leaders, keeps orders correct and on time.

STAGE D

Final product

Units of the highest quality that perform year after year, and among the safest available anywhere.

FIG. 03 · FOUR-STAGE ORDER FLOW, ASSESSMENT THROUGH DELIVERY
Flameco equipment in service in the field
04 WHY IT MATTERS

Downtime doesn't wait
for a redesign.

When a fire tube or mixer wears out in the field, the fastest safe fix is the part that was engineered for that vessel in the first place. That's what the file is for, and why we've kept every one since 1980.

Look up my unit See units in the field
FIG. 04 · IN SERVICE
05 READY WHEN YOU ARE

One number gets the exact part moving.

Have the serial or PO? Start the replacement above. Starting from scratch, or not sure what you need? Get in touch and we'll get back to you as soon as possible.

(918) 832-1100 · ONLINE@FLAMECO.COM · TULSA, OK · SINCE 1980